When I was a younger man, my wife and I decided to finish the partially completed basement of our house. I already had some experience and understanding of carpentry, but still had much to learn. I nailed up the walls, put in some insulation and began to throw up the sheet rock.

Overall things went well, but I found many opportunities to re-do much of my efforts. I cut his stud too long, the next one too short. Once I finally got it just right, I would split the wood while nailing it in (grrrrr). Bent nails? Yep, I had a whole box of them. Sink this nail, bend the next, drive one home, bend the next three. (I guess I should have used a nail gun instead of swinging a hammer.)

I decided to put up the sheetrock using screws. I thought I would do much better than with hammer and nails. I still found opportunity to re-do some work. Drive this screw just right, the next four I would send too deep through the paper (double grrrrr).

One evening, when I got home from work, my wife asked me to follow her downstairs in order to discuss some of my wonderful work. With a certain amount of pride, I walked down the stairs with gloating anticipation. She picked up a sheetrock screw and walked over to one of the recently completed walls.

Showing me the screw, she demonstrated what she had observed that day. My young son (about two years old) would squat by each screw hole in my sheetrock and touch the end of a screw to it. Each time reciting the words "damn it". Hmmm, one must wonder where a child so young would pick up such a filthy vocabulary. Gladly, we were able to break him of that habit!!

Saturday, June 7, 2008

What's the big hurry anyway?

Why finish by the middle of June? Our son comes home from Brazil this month! The rest of the summer is for playing!

Questions:
We are replacing the front lawn for several reasons:
1 - I replaced the main water line last fall, removed a large tree stump this spring and are going to trench for a sprinkler system...30% of the lawn already destroyed by those activities.
2 - We have tried for several years to make the lawn healthy with mixed results. The condition of the ground is poor/compacted/etc. Aerating yearly has helped but not fast enough.
3 - Lots of root systems in the grass causing multiple issues.
4 - Most of the grass wanted shade and is now in direct sun now that the major tree coverage is gone. The bluegrass is mostly gone so requires over-seeding or replacement.

How did/are we do it?
1 - Rented a "sod cutter" for $70.00. We were able to cut the sod in the front yard in less than an hour (around 40 by 30 foot yard). You can use a square nose shovel or a sod pick to cut under the sod, but I am lazy. The sod cutter is easy to operate but TJ did have a problem turning it at the end of each row.
2 - We tried to beat some of the dirt out of the old sod. Lots of work and not really needed if you cut the sod thin enough. There is a balance between leaving root/thatch and leaving dirt. The grass can bee discarded or taken to a "green" location for recycling...up to you.
3 - We have some roots (some big some small) from the old and existing trees. We plan on removing as much of that as possible.
4 - We are prepping the soil by tilling it several inches in order to help the new sod get a good start. We have very heavy/compatible clay here. We plan on breaking that clay barrier, adding some organic matter, fertilizer and possibly some addition dirt. Mix all that up, level it, remove the "top rocks" and then roll it firm.
5 - We will rent a trencher next weekend and put the sprinkler system in, re-prep the areas we disturb putting the sprinkler and we're ready for sod.
6 - Putting in the sod shouldn't be too bad. It can be a back breaking event (ask my younger brother) but this lawn is small and should be accomplished in an hour or so. TJ is ordering the sod the first part of next week.
7 - Sit back with a soda in hand to watch the sprinkler and the sun do it's job and then make the kids mow it 2-3 weeks later.

Tuesday, June 3, 2008

Update on the yard.

The fence is most of the way up. Yesterday we decided to replace the end post even though it was in reasonably good condition. Took about an hour to dig/break/slide it out of the ground and under the edge of a concrete slab that covered 1/2 of the concrete holding the post. Tonight we will install 2 new posts at the end of the fence. Tomorrow we install the last 4 rails and the remaining fence slats. Thursday we begin tilling the front yard and prepping it for the sprinkler and new sod. TJ removed all of the old sod over the past couple of days. 16 days left to get it all done!!

Saturday, May 31, 2008

Building...building...building


Got a lot of projects in the hopper right now. The problem is that we have a time frame that requires us to finish all of them by the middle of June. This past week was spent removing an old fence (including the concrete slugs that use to hole the rotted out fence posts) and we were able to cement 6 of the 11 new fence posts. Last weekend we took a sod-cutter and removed all of the grass from the front yard. Once the fence is done we till the yard, compact it, trench for sprinkler system and then put down new sod. This morning I am still "exhausted" and still have 8-10 hours of work installing the fence and trying to put in the last of the posts.

All that being said...I still haven't finished the bathroom (an inside joke in our family, one that the wife doesn't think is all that funny).

Tuesday, May 13, 2008

Building a shed.


I am building a shed. Here are a couple of questions that might help me.

I am not sure rather to notch the 2x4 on the rafter or not. The risk is that the board may spit under the load of the roof. The rafters are 2x4 with 16 inch centers and only about 4 feel long. I think I am safe either way. What do you think?

Tuesday, April 29, 2008

Pullin' Trees



We had to remove an apple tree from our front yard. Last year there was significant wind damage that twisted, broke and cracked several of the main branches. While it is possible to bolt limbs together, this tree was old and had other issues so we decided to take it out.

Last fall we cut the tree down and left a 6 foot stump (2 foot diameter) over the winter (I got lazy). So, the first project for the spring was to remove the stump. We had a couple of bids that were over $250.00 which included grinding the stump a couple of inches below ground level. I decided that I could pull the stump myself for much less (free).

I spent a total of 8 hours over two Saturdays pulling it out. (20 minutes work, 40 minute break, etc.) I had to dig down about two feet and cut thee major roots, 4-5 medium sized and many smaller roots. Pulling the stump with the truck became very easy after all the preliminary work. Sore muscles yes, but a lot of satisfaction. Doing the math (8 hours at $250.00) I made/saved about $31.25 per hour. I guess that made it worth it.